Gloucester Royal Hospital – Civils / Enabling & Minor Works Package
Duration: 5 months
Start: ASAP
Scope of Works Includes
- Preparation of multiple areas for CFA piling (circa 60 remaining)
- Installation of ring beams following piling completion
- Concrete slab construction across multiple areas (circa 120m²)
- Masonry structure works (circa 100m²), including timber trusses and slate roof coverings
- Minor internal wall construction
- Epoxy floor coatings (circa 60m²)
- Kerbing (circa 100 linear metres)
- EPDM roofing (circa 14m²)
- Small canopy extension
- Replacement of soffits and fascias (circa 33m²)
- Structural steel elements including wind posts, trimmer beams, and temporary/permanent steel for large generator installations
- Tarmac surfacing (circa 180m²)
- Drainage works including French drains, diversions, and new installations to service new structures
- Installation of metal doors and louvres (circa 15nr)
This package combines enabling works, civils and associated minor building elements within an active hospital environment.