Contract Controls Engineer

Company: Samuel Frank
Apply for the Contract Controls Engineer
Location:
Job Description:

Controls Engineer – Contract – Yorkshire – Outside IR35 – 6 months initially – £45‑£50 per hour

Headlines – outside IR35, immediate start, full order book, strong pipeline of projects

Samuel Frank is recruiting for a Controls Engineer on a contract basis to join a well‑established special purpose machine manufacturer based in Yorkshire.

This contract role will suit a Controls Engineer with strong commissioning and installation experience, particularly within special purpose machinery environments, with additional experience of motion control systems. This is a hands‑on role, not a full‑time desk‑based position, so will suit a Controls Engineer who is comfortable working on the shop floor and has come from a practical, time‑served apprenticeship background. The successful Controls Engineer will be required on site in Yorkshire five days per week, with occasional longer periods of site work.

Key Skills and Experience

  • Strong commissioning and installation experience on special purpose machinery projects
  • Proven Siemens PLC experience, ideally with S7‑1500 / TIA Portal
  • Experience of motion control systems including servo drives, positioning systems and synchronisation
  • Experience of working with Rockwell / Allen Bradley PLCs would be advantageous
  • Hands‑on approach with the ability to work effectively on the shop floor during build, install and commissioning phases
  • Likely to have completed a time‑served apprenticeship or have a strong practical engineering background
  • Ability to interrogate, modify, tweak and enhance existing PLC code
  • Support full system commissioning through to successful FAT and SAT
  • Experience of working on customer sites, including fault finding and resolving issues under pressure
  • Ability to work closely with mechanical and electrical teams during installation and commissioning phases
  • Comfortable working in a fast‑paced environment with tight project deadlines
  • There will be an expectation to complete site‑based commissioning phases lasting approximately three to four weeks at a time, typically once every six months

Role Overview

The successful Controls Engineer will play a key role in delivering commissioning and installation activities across a range of projects, with a strong focus on complex motion control performance, ensuring systems are operational, optimised and handed over successfully.

Please apply today for an immediate response.

#J-18808-Ljbffr…

Posted: March 27th, 2026